Schedule, schedule, schedule. Educational facilities are almost always managed around a tight schedule (usually only working in the summer months with nights and weekends). We pride ourselves in our flexibility and dedication to get projects done on time so our educational clients can meet their responsibilities.
As part of their tech upgrade, the school asked us to remove all of their exterior located lockers and convert the area to a garden and lounge area for the students. We removed all of the hardscape, removed tanks from the science labs, poured a creative concept seating area and craned in two large trees to finish the area all in a tight “summer break” timeframe. ARC was proud to donate the profits on this project back to Brophy’s scholarship fund.
This job is a perfect example of our “everyday” work. Located in a retail center, this was a small space that needed a full demo and then turn key build out.